Cisco 3030 User Manual Page 34

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 33
2-6
Cisco Catalyst Blade Switch 3030 Hardware Installation Guide
OL-8389-01
Chapter 2 Switch Installation
Installing the Switch Module into the Server Chassis
Installing the Switch Module into the Server Chassis
For a description of the switch module, see the “Features” section on page 1-1.
Follow these steps to install the switch module into the server chassis:
Step 1 Obtain and make note of this information from your network administrator before you begin the switch
module installation:
Switch IP address
Subnet mask (IP netmask)
Default gateway (router)
Enable secret password (encrypted)
Enable password (not encrypted)
Telnet password
SNMP community strings (optional)
Step 2 Select a chassis I/O module bay in which to install the switch module. Follow the prerequisites listed in
the “Dell Modular Server Chassis Architecture” section on page 2-5.
Step 3 Remove the end-cap (blank plug) from the selected bay. Store the end-cap (blank plug) for future use.
Step 4 If you have not already done so, touch the static-protective package that contains the switch module to
an unpainted metal part of the server chassis for at least 2 seconds.
Step 5 Remove the switch module from its static-protective package.
Step 6 Ensure that the release latch on the switch module is in the open position (perpendicular to the module).
(See Figure 2-2.)
Figure 2-2 Switch Module Release Latch in the Open Position
Step 7
Slide the switch module into the appropriate bay until it stops.
143473
11x
12x
13x
14x
15x
16x
Console
11x
12x
13x
14x
15x
16x
CON
Page view 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 71 72

Comments to this Manuals

No comments