Procedure 5 Connect to distribution or WAN router
Access layer devices can be one component of a larger LAN and connect to a distribution switch, or, in the case
of a small remote site, might be the only LAN device and connect directly to a WAN device. Unless the access
layer device is a single fixed configuration switch connecting to a WAN router, Layer 2 EtherChannels are used to
interconnect the devices in the most resilient method possible.
When using EtherChannel, the member interfaces should be on different switches in the stack or different
modules in the modular switch for the highest resiliency.
The physical interfaces that are members of a Layer 2 EtherChannel are configured prior to configuring the
logical port-channel interface. This allows for minimal configuration because most of the commands entered to a
port-channel interface are copied to its members’ interfaces and do not require manual replication.
Figure 12 - EtherChannel example
2096
Distribution
Switch
Logical
PortChannel
Interface
Switch Stack
Member
Interface
Member
Interface
Configure two or more physical interfaces to be members of the EtherChannel. It is recommended that they are
added in multiples of two.
This procedure details how to connect any access layer switch (Cisco Catalyst 4500, 3850, 3650, 3750-
X, 3560-X, 2960-X, or 2960-S) or to a distribution switch or WAN router. Where there are differences for
configuring a specific switch, the differences are called out in the step. If the upstream device is not a distribution
switch (such as a remote site connection to a router) use Option 2 with an interface type that is appropriate for
the deployment.
Option 1: Congure EtherChannel to distribution switch
Step 1: Configure EtherChannel member interfaces.
This design uses Layer 2 EtherChannels to connect all access layer switches to the distribution layer. When
connecting to another switch, use two links or a multiple of two links distributed for maximum resiliency. A
configuration with four links is shown in the example. Set Link Aggregation Control Protocol negotiation to active
on both sides to ensure a proper EtherChannel is formed. Also, apply the egress QoS macro that was defined in
the platform configuration procedure in order to ensure traffic is prioritized appropriately.