Table 2-1 SCE Platform Model Information
Model number SCE 1010 2xGBE
Link Type Gigabit Ethernet
Number of Ports 2
Number of Links 1
Site Preparation and Unpacking
Lift the SCE 1000 platform safely out of the packing container.
Ensure the power service at the site is suitable for the SCE 1000 platform.
Check the packing slip to ensure that all the proper components are present.
Locate and have accessible the Site Log for recording information about this installation.
Tools and Parts
Use the following list of tools and parts as a checklist for preparing for installing the SCE 1000 platform:
Appropriate cables to connect the SCE 1000 to the network and console terminal
Tape measure (optional)
Level (optional)
Number 1 Phillips screwdriver
Number 2 Phillips screwdriver
1/4-inch flat-blade screwdriver
1/4-inch hex wrench
Grounding kit (shipped with SCE 1000)
12 AWG or 2.5 mm copper installation wire with hex or loop connectors for DC power leads (DC power only)
Ring terminals must be UL approved and suitable for 12 AWG wire.
AC power cords (AC power only, shipped with SCE 1000)
Rack-mounting kit (shipped with SCE 1000)
Spare screws for changing bracket position
Prepare for Rack-Mount Installation
Before you begin the rack-mounting tasks, determine the type of rack—four-post or two-post—that you will be using.