Cisco 2955 Installation Guide Page 78

  • Download
  • Add to my manuals
  • Print
  • Page
    / 298
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 77
Chapter 3 Installation
Verifying Switch Operation
3-14
Catalyst 2955 Hardware Installation Guide
78-14944-03
Note The Catalyst 2955 switch can be used with an optional AC/DC power converter
(PWR-2955-AC=) in a nonhazardous location installation.
For instructions on how to connect the power converter to the switch, see the
Connecting the Switch to the Power Converter section on page 3-29.
Locate the power and relay connector, the ferrite, and the switch installation
protective liner in the switch kit.
Note You can get replacement power and relay connectors (PWR-2955-CONNECT=)
by calling Cisco Technical Support. See the Obtaining Technical Assistance
section on page xxx.
Obtain these necessary tools and equipment:
Ratcheting torque flathead screwdriver that exerts up to 15 inch pounds
(in-lbs.) of pressure
Ring terminal lug (such as Thomas & Bett part number RC10-14 or
equivalent)
Crimping tool (such as Thomas & Bett part number WT2000, ERG-2001, or
equivalent)
10- to 12-gauge copper ground wire (such as Belden part number 9912 or
equivalent)
Wire for power connections:
For input AC power connections to the power converter, use a standard
18-gauge AC power cord. See the Preparing the AC Power Cord
section on page 3-35 for instructions on how to prepare an AC power
cord for use with the power converter.
For DC power connections, use UL and CSA rated, style 1007 or 1569
twisted-pair copper appliance wiring material (AWM) wire (such as
Belden part number 9318).
Wire-stripping tools for stripping 10- to 12- and 18-gauge wires
Page view 77
1 2 ... 73 74 75 76 77 78 79 80 81 82 83 ... 297 298

Comments to this Manuals

No comments