Cisco 2955 Installation Guide Page 88

  • Download
  • Add to my manuals
  • Print
  • Page
    / 298
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 87
Chapter 3 Installation
Verifying Switch Operation
3-24
Catalyst 2955 Hardware Installation Guide
78-14944-03
Note If you plan to connect external alarm devices to the alarm relays, go to the Wiring
the External Alarm Device Relays section on page 3-48. Otherwise, go to the
next section.
Add the Ferrite to the Power and Relay Connector Wiring
Before you connect the power and relay connector to the front panel, follow these
steps to add a ferrite to the power and relay connector wiring.
Step 1 Position the opened ferrite around the wiring within 3 inches of the power and
relay connector.
Step 2 Loop the wiring around the ferrite (see Figure 3-10).
Figure 3-10 Wire Looped Through the Ferrite
Step 3
Press the ferrite closed until the clasp snaps shut (see Figure 3-11).
104565
Page view 87
1 2 ... 83 84 85 86 87 88 89 90 91 92 93 ... 297 298

Comments to this Manuals

No comments