Chapter 3 Initially Configuring the ATM Switch Router
Configuring Redundancy and Enhanced High System Availability (Catalyst 8540 MSR)
3-23
ATM Switch Router Software Configuration Guide
78-6277-03, Cisco IOS Release 12.0(13)W5(19)
The following example shows how to display the details and status of the snake test:
8540MSR#show diag online snake
======== Online Snake Test Status and Details ========
-------- Test Status --------
Current Test Status : Test is Enabled
Current Test Type : Normal Snake
Last Test Status : Pass
Last Test Run Time : 1w1d
Last Test Success Time : 1w1d
-------- Test Details --------
Snake Test Pkt Size : 30 bytes
Default Test Period : 60 seconds
Current Test Period : 60 seconds
----------------------------------
Statistics from Bootup
----------------------------------
Total Test Runs : 17311
Number Normal Snake Test Runs : 17311
Number of Successive Normal Snake Test : 14083
Number of Incrimental Snake Test Runs : 0
------------------------------------------
Ports Test Stat in Last Iteration
------------------------------------------
Port Card Type Result Test Time
_______ ________________ __________ _________
09/0/00 OC48c PAM PORT_OK 1w1d
10/0/00 QUAD 622 Generic PORT_OK 1w1d
11/0/00 OC48c PAM PORT_OK 1w1d
12/0/00 QUAD 622 Generic PORT_OK 1w1d
-----------------------------------------
Ports Failed Stat from Bootup
-----------------------------------------
No Port failed from Bootup
Configuring Redundancy and Enhanced High System
Availability (Catalyst 8540 MSR)
The ATM switch router supports redundant CPU operation with dual route processors. In addition,
Enhanced High System Availability (EHSA) is provided in the switching fabric when three switch
processors are installed in the chassis. These features and their configuration are described in the
following sections:
• Route Processor Redundant Operation (Catalyst 8540 MSR) on page 3-24
• Synchronizing the Configurations (Catalyst 8540 MSR) on page 3-26
• Displaying the Route Processor Redundancy Configuration (Catalyst 8540 MSR) on page 3-28
• Preparing a Route Processor for Removal (Catalyst 8540 MSR) on page 3-28
• Configuring Switch Fabric Enhanced High System Availability Operation (Catalyst 8540 MSR) on
page 3-30
Comments to this Manuals