4-19
Cisco MGX 8230 Edge Concentrator Installation and Configuration
Release 1.1.31, Part Number 78-11215-03 Rev. B0, May 2001
Chapter 4 Enclosure Installation
Rack Mounting an MGX 8230
4. After each service module comes up, the status LEDs on each should show that it is in standby.
5. When power is turned on, make a visual check to verify that all fans are running.
6. After the system comes up, execute the dsppwr command.
Configuring the MGX 8230 as an BPX Feeder
Connecting an MGX 8230 to an BPX and configuring it to function as a feeder is covered in Chapter 5,
“Configuring the MGX 8230 Shelf.”
Comments to this Manuals