134 Implementing Cisco InfiniBand on IBM BladeCenter
7.4.2 Summary of steps to create a tagged VLAN bridge group design
Here, we provide a summary of the steps that we describe in the remainder of this section to
implement a tagged VLAN bridge group design:
1. In the 3012 Element Manager, bring up the Bridging window and fill in the Groups,
Forwarding and subnet tabs (step 1 on page 134).
2. Commit the new Bridge Group information and review (step 2 on page 135).
3. Save the 3012 config to NVRAM (step 3 on page 135).
4. Configure the upstream 4948 to match the Ethernet Gateway configuration (step 4 on
page 135).
5. Test the configurations by pinging from the InfiniBand client to the default gateway on the
4948 (step 5 on page 136).
7.4.3 Detailed steps to implement a tagged VLAN bridge group design
To implement a tagged VLAN bridge group design, follow these detailed steps:
1. On the Element Manager window, click Ethernet Bridging. Follow the steps in the
previous example (Figure 7-5 on page 125), but when you select the Ethernet members,
enter 88 into the VLAN field and then click OK.
Make sure to also configure the Forwarding tab and the Subnet tab as per the previous
examples in Figure 7-8 on page 128 and Figure 7-9 on page 129.
Figure 7-12 shows the new BG1 bridge group, tagged VLAN 88, ready for saving.
Figure 7-12 Bridge group BG1 configured to use VLAN 88