Task 2: Configuring IP and Ethernet interfaces Chapter 6: Configuration and alignment
6-8
phn-2513_004v000 (Oct 2012)
Task 2: Configuring IP and Ethernet interfaces
This task consists of the following procedures:
• Managing the units during configuration and alignment on page 6-8
• Configuring the IP interface and management mode on page 6-10
• Reconnecting to the management PC on page 6-19
Managing the units during configuration and alignment
Choose the best way to manage the PTP 800 units during the configuration and alignment
process.
Out-of-band management
Where out-of-band management is chosen, the management port is active and a PC can be
locally connected. Once the wireless link is operational, the remote PTP 800 unit may also
be accessed across the wireless link.
In a 1+1 Hot Standby link with out-of-band management, connect to both PTP 800s in one
of the following ways:
• Locally from the Ethernet port of the protection splitter
• From a PC connected to a local switch where routing and connectivity exist for
accessing the Ethernet port of the protection splitter.
• Before the protection splitter is installed, locally from the management port.
Comments to this Manuals