Cisco ONS 15454 SDH Specifications Page 245

  • Download
  • Add to my manuals
  • Print
  • Page
    / 504
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 244
5-55
Cisco ONS 15454 SDH Installation and Operations Guide, R3.3
May 2002
Chapter 5 SDH Topologies
Creating Linear ADM Configurations
b. Record the circuit information using one of the following methods:
From the File menu, choose Print to print the circuits table, or,
From the File menu, choose Export to export the circuit data in HTML, CSV (comma separated
values), or TSV (tab separated values). Click OK and save the file in a temporary directory.
See the Printing CTC Data section on page 2-29 and the Exporting CTC Data into Other
Applications section on page 2-30 for more information.
Step 12 Remove the STM-N cards that are no longer connected to the end nodes (Slots 5 and 13, in the example).
Step 13 In CTC display one of the end nodes (Node 1 or Node 3 in the example).
Step 14 Click the Provisioning > SDH DCC tabs.
Step 15 In the SDCC Terminations section, click Create.
Step 16 In the Create SDCC Terminations dialog box, choose the slot/port that was the protect slot in the linear
ADM, for example, in Node 1, the previous protect slot is Slot 5/Port 1 (STM-16).
Step 17 Click OK.
An EOC SDCC alarm will occur until you create an SDCC termination on the adjacent node.
Step 18 Display the node on the opposite end (Node 3 in the Figure 5-40 example) and repeat Steps 14 17.
Step 19 Delete and reenter the circuits one at a time. (See the Creating VC High-Order Path Circuits section
on page 6-2.)
Note Deleting circuits is traffic affecting.
You can create the circuits automatically or manually. However, circuits must be protected. When they
were built in the linear ADM, they were protected by the protect path on Node 1/Slot 5 to Node 2/Slot
5 to Node 3/Slot 13. With the new SNCP create circuits with protection.
Deleting the first circuit and recreating it to the same card/port should restore the circuit immediately.
Step 20 Monitor your SDH test set to verify that the circuit was deleted and restored.
Step 21 You should also verify that the new circuit path for the clockwise (CW) fiber from Node 1 to Node 3 is
working. To do this, display the network view and move your cursor to the green span between Node 1
and 3.
Although the cursor only shows the first circuit created, do not become alarmed that the other circuits
are not present. Verify with the SDH test set that the original circuits and the new circuits are operational.
The original circuits were created on the counter clockwise linear path.
Step 22 Display the network view to view the newly-created ring.
Procedure: Convert a Linear ADM to an MS-SPRing
Caution This procedure is service affecting.
Caution Always wear an authorized electrostatic discharge wrist band when removing or installing ONS
15454 SDH cards.
Page view 244
1 2 ... 240 241 242 243 244 245 246 247 248 249 250 ... 503 504

Comments to this Manuals

No comments