1-4
Cisco ONS 15454 SDH Installation and Operations Guide, R3.3
May 2002
Chapter 1 Hardware Installation
Installation Equipment
Caution Only use the power cable shipped with the ONS 15454 SDH.
1.2.2 User-Supplied Materials
The following materials and tools are required for installation but are not supplied with the ONS 15454
SDH.
• Equipment rack (ETSI-rack, 2200 mm x 600 mm x 300 mm, H x W x D)
• Fuse and alarm panel
• Copper ground cable 13.3 mm² (#6 AWG) stranded, specified for up to 90° Celsius
• Alarm cable pairs for all alarm connections, 0.51mm² or 0.64mm² (#22 or #24 AWG), solid-tinned
• Single mode SC fiber jumpers with UPC polish (55 dB or better) for optical cards
• Coaxial cable terminated with 1.0/2.3 miniature coax connectors for FMEC cards
• DB-37 Connecting cable
• Shielded BITS-clock coaxial cable terminated with 1.0/2.3 miniature coax connectors
• Labels
1.2.2.1 Tools Needed
• #2 Phillips screwdriver
• Medium slot-headed screwdriver
• Small slot-headed screwdriver
• Video fiber connector inspection instrument
• Cletop cleaning cassette
• Crimping tool—This tool must be large enough to accommodate the girth of the grounding lug when
you crimp the grounding cable into the lug.
• Wire stripping tool
1.2.2.2 Test Equipment
• Volt meter
• Power meter (only for use with fiber optics)
• Bit Error Rate (BER) tester for E1-N-14, E3-12, DS3i-N-12, and FMEC cards
Comments to this Manuals