Chapter 4 Installation and Startup
Installation
SCE 1000 2xGBE Release 2.0.10 User Guide
4-8 OL-7117-02
To install the SCE 1000 on a workbench or tabletop:
Step 1 Follow the installation precautions in Installation Precautions (on page 4-7).
Step 2 View the bottom panel by lifting the SCE 1000, placing your hands around the SCE
1000 sides and lifting the SCE 1000 from underneath. To prevent injury, avoid sudden
twists or moves.
There are four marked locations, indicating where to affix the rubber feet (see figure
above).
Step 3 Attach the rubber feet by removing the adhesive strips and affix the rubber feet onto the
marked locations (on the bottom panel).
Remember to check for proper ventilation. Allow at least 2 inches (5 cm) on each side
for proper ventilation and 5 inches (12.7 cm) at the back for ventilation.and power cord
clearance.
This completes the general workbench or tabletop installation.
Proceed to section, Connecting to the Power Supply to continue the installation.
Mounting the SCE 1000 in a Rack
You can mount the SCE 1000 to a 19” rack. There are two standard types of equipment racks, and
the appropriate brackets for each are provided in the enclosed kit.
• 19” rack with front rack posts: the mounting kit includes two mounting brackets
• 19” rack with front and back rack posts: in addition to the mounting brackets, the mounting
kit includes two crossrail supports that the unit slides onto
The SCE 1000 mounts to the two front rack posts with brackets that attach to the front of the SCE
1000 The inside width between the two posts or mounting strips (left and right) must be at least
17.3 inches (44 cm).
Note
Remember to leave a two-inch (5 cm) clearance on both sides of the SCE 1000 and at the rear for
adequate airflow for the inlet and exhaust vents.
Because the inlet and exhaust ports (vents) for cooling air are located at both sides of the chassis,
respectively, multiple SCE 1000s can be stacked in a rack with no vertical clearance.
Comments to this Manuals